Hardware with defended margins
- Partner pricing on the full BESS range (EOM = 115 / 1.215 / 1.260 + enterprise)
- EMS licensing with partner economics — margin on the full stack, not just the metal
- No fee structure
- Channel-conflict rules
Specify Monbat Energy as your industrial BESS+EMS line — and build recurring revenue on top.
Certified European-built hardware with partner economics, structured training and certification path, a real co-branding relationship, and one named partner manager per account.
Four pillars. Each backed by specific commercial terms or a specific person — not a brochure promise.
A real I-260 deployment.
Charge Point Operator
CHALLENGE
The charging site requires 600 kW to support current and future demands. The existing grid connection is limited. Expanding the grid connection would require significant infrastructure updates with estimated cost of €267k.
SOLUTION
MONBAT Energy EOM 780 enables DC fast charging with the EMS configured to Peak Shaving, Dynamic Tariffs and Dynamic Load Balancing for charging stations. Three weeks from installation to live operation.
RESULTS
A major achievement driven by outstanding teamwork, decisive project management and relentless focus. From planning to
commissioning, the entire project was delivered in only six months bringing value to the business faster than expected.
See if these numbers are realistic for your facility
Book a free 15-min assessment — our regional expert will get in touch within 24h with a tailored BESS sizing and ROI estimate for your facility.